Case Study of Steam Turbine Bin Qasim Thermal Power Station Karachi
By: Arain Abful Rasheed.
Contributor(s): Department of Mechanical Engineering.
Material type:
BookPublisher: Nawabshah QUEST 1997Description: 92p.
| Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
|---|---|---|---|---|---|---|
Thesis and Dissertation
|
Research Section | Available | P/6-47 |
Total holds: 0
Thesis and Dissertation
There are no comments for this item.